Hot search: KNOB 
 

Pre Insulated Pipe

Click on the image to check the artwork
unit price: negotiable
min amount:
amount:
period for delivery: Consignment Deadline Days
area: Hebei
Expiry date : Long Effective
last update: 2023-05-23 12:26
view count: 363
enquiry
Company Profile
 
 
Product details
Detailed Description


Product name

pre insulated pipe

structure

steel pipe, insulation layer, HDPE outer protection pipe

steel pipe

1. Seamless,
2. Spiral steel pipe( SAW)
3. Straight steel pipe(ERW)

Steel pipe standard
and material

1. GB 20#, Q235B
2. ASTM A53 GrB
3. API Spec 5L 16Mn, X42-X80

HDPE outer protection pipe

High density polyethylene( black or orange)

Application

1. District heating
2. District cooling
3. Crude oil transportation
4. Cogeneration project

Standard

1. GB/T29047-2012
2. CJ/T114-2000 3. CJ/T155-2001
4. EN253
5. EN448

Laying mode

It is mainly used for direct-buried laying, and can also
be used for indoor.

Advantages

1. Unique trinity structure
2. Low thermal conductivity, small the heat loss
3. Water-proof
4. Anti-corrosive

Production range

DN20-DN1600mm

Related products

1. The pre-insulated pipe with alarming line
2. Joint materials
3. Insulation fittings


Production process flow of insulated steel pipes:
  1. Lift the steel pipe after shot blasting and rust removal to the threading platform.
    2. Fix the bracket on the steel pipe with iron wire according to the thickness of the insulation layer.
    3. Install the pipe shell, insert the high-density polyethylene pipe shell onto the steel pipe with the fixed bracket, and then seal both ends of the high-density polyethylene pipe shell with flanges. Inject polyurethane material into the middle of the pipe shell. For the convenience of installation and welding, according to the design regulations, the high-density polyethylene pipe shell is 150-250mm shorter than the steel pipe.
    4. After the polyurethane material is foamed, remove the sealing flange; Pipe end treatment, horizontal placement of pipes and numbering.
    5. After passing the inspection, hoist the insulation pipe to the finished product area.


http://www.tsxingbang.com/

Total0bar [View All]  Related Comments
 
More>other products

[ ProductsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed